-To remove the wood and concrete pouring after braced. Make poles, beams, walls must not be less than 2 days in the belly of the beam and the surface is not less than 7 days after the removal of beams and the floor, braced against the complete 21 day when removing the wood, and then it turns out that a small hole or a rough surface, with water, sand and cement mortar 1 chum with filling: 2, smooth skin is the same, but if there is a hole in the concrete which engineers consider that harm to the weight. Contractors will need to make a new and clean according to the directions of the engineer. Without any conflict after cracking the concrete curing compounds must be the correct way. Curing concrete pillars and beams, use burlap-covered pan, then pour over water treatment at any time. Concrete flooring is best, use clay barrier surrounding edge and leave 5-day detention during the concrete curing prohibiting any weight to press through a lack.