2 reinforced concrete buildings. Coed dormitory building after a new 17-storey (mezzanine and machine room are not included. Rooftop) and a 3-storey multi-purpose building 1.
Concrete building consists of two 17-storey dormitory building new students (excluding mezzanine. Deck and engine room) of the first and third floors of one building highly versatile back.
Reinforced concrete buildings after the 2 include dormitory after a new high 17 floor (not รวมชั้นลอย and the deck). The 1 after and multi-purpose building, high 3 I was 1 after.