The experiment is shown. Scheduling Auto water system can work effectively when the timer is stopped watering can watering the plant scheduled to be precise. Because of scheduling a numbered fixed. And select the time For feedback of the project. The analysis should be integrated so well before. Before proceeding to the wiring in the Control Panel, to avoid damage to the equipment inside the enclosure Control.
การแปล กรุณารอสักครู่..