4th installment of 6,749,327.62 Baht (., Six million, seven hundred and forty-nine thousand three hundred twenty-seven baht sixty-two cents).
Condo C, Condo D
- structural beam, 1st floor / 1st floor / wall 1 / column 1 /. Lift 1 / stairs 1 (Ground Floor structure) Beam / Slab / Wall / Column / Lift / Stair (100%).
- Electrical Class 1 Electric System (Electric Conduit 10%).
- plumbing layer 1 Sanitary. System (Drain & Airvent 10%).
Swimming Pools
- the State Supreme area and the area (Mobilization and Lay out) 100%.
- Structural beams / flooring SWIMMING POOLS structure (Beam / Slab) 50%.
- Systems Swimming (Swimming Pool system. ) 20%