3.3.1.3 measures to prevent and correct environmental impact
1) construction (1) Case conducted in agricultural areas should be carried out after the farmers have already harvested
. (2) public relations, who has been the impact on land utilization has been aware of the inconvenience of access to benefits, as well as installation of banners so. (3) construction planning in each point, strong and short construction time
2)
Operation phase. Coordination with the Department of land development and Agriculture Office, providing knowledge about plants that use less water in the dry season, instead of doing naprang. Provide sufficient water requirement of the project
3.3.1.4 measures for monitoring environmental effects.
1
construction phase) There are no measures for monitoring the effects of
2)
Operation phase. There are no measures for monitoring impact
3.3.2. Water usage
3.3.2.1 In the current environment.
From a review of the relevant study report with the right side of the Lam Pao River. In the demand for water, water requirements can be classified into 5 categories, with details on the various aspects of water use requirements. :
1) water demand for consumer and tourism
2) Water demand for agriculture
3) industrial water demand
4). Water requirements for livestock
5) Water requirements to maintain ecological water end