4.1.3 measures to prevent and resolve health impacts
4.1.3.1. Dust
1). Construction term
(1) measures for contractors to provide water trucks in construction area and carpet in the injection area, construction and road construction area entrance lateritic project at least twice a day. (2) define measures to provide contractors with fabric covered canvas truck while transporting supplies to the project at all times. To reduce dust from shipping, including the speed limit of no more than 30, trucking. And no more than 80 kilometers per hour in the General area, and maintenance of the car
. (3) measures for contractors, regularly check the machine is in good condition on a regular basis, in order to reduce air pollution caused by construction activities.
(4) require the contractor to prepare a device or dust protective mask as well as construction workers, and to reiterate, there is space to spread dust in distribution, especially the construction area. 8.00-NN17 am so that they do not interfere with the rest of the people
2)
Operation phase. There are no measures to prevent and resolve health impact
.
การแปล กรุณารอสักครู่..