The history of the creation of the dam Ubolratana Ubolratana dam hydro dam is the first of its kind built in the Northeast and is the 2nd child from King bhumipol dam the dams built blocking the river share the area called "share the clutch" high inflation, water district, Tambon khok, King Amphoe Ubolratana. In the past or currently Ubolratana district Khon Kaen Khon Kaen province 50 kilometers away from the start when routing a Board when 2502 (1959) consisting of. Cambodia, Laos, Viet Nam and the Thai South e Cafe (Faculty of economic activity was important in Asia) As an established and received cooperation from Japan specialists have made a survey of river, a branch of the Mekong River and the proposed river project, consider the flesh first, because you see the beneficial development of Northeast. Later, the Thai Government has negotiated loan contracts to Bank for reconstruction, the promise of the United Republic of Germany, to design and construction. The Act gives power to the Northeast is the construction. When did construction begin 2504 (1961) in the late years of completion and 2507 (1964) 2508 (1965) his Majesty is his Royal Majesty, Royal is thanop tea breaks, invited her daughter, a granddaughter of George III? Chao FA Ubolratana dam sobriquet kanya King said Ubolratana dam "and opened by his Majesty his Royal act together. Phra Borommarachininat H.R.H. King and her son III Chao FA Ubolratana of kanya to Ubolratana dam, he opened the ceremony to deliver electricity in March 14, 1966. Ubolratana dam was a dam Phong clutch. The Phong River block building, Khon Kaen is Ubolratana dam. Hydro power, the first of its kind that EGAT has built up in the Northeast and is the country's second Thai from. Bhumibol dam, the dam is a rock-filled clay core. With a length of 885 meters high, 32 m: 185-meter dam at low + (great g-medium sea level.) 6 metre wide dam is a dam in San base width of 120 m 2 with a capacity of reservoir, 263 million cubic meters. Building a power plant. Located on the left side the dam installed generator capacity of 8400 total machine capacity 3 kW total kW 25200 EGAT has made the following improvements to the Ubolratana dam is a dam in the optimizer on ronthao floods, and is strengthening the security for the dam by the dam's 185 + level supplement meters (great..) is at level + 188.10 meters (great..) the dam base section at the end of the original 120 meters wide, which is expanding from a 125 m by the end of the year but began 2527 (1984) stools and update was completed at the beginning of the year 2530 (1987) Location: Ubolratana dam Create block Phong River The area is also known as Phong clutch. Ubolratana dam, located in Amphoe Ubolratana of Khon Kaen (tambon khok Sung district of water formerly filled up later in 2517 (1974) has as a King Amphoe Ubolratana and Amphoe Ubolratana 2522 (1979) currently is) far from the town of Khon Kaen, about 50 km away by highway, about 25 km Nong Khai, Nakhon Ratchasima friendship split along Highway 25 km approx. 2109. Watershed conditions. Ubolratana dam basin consists of 3 important rivers are the river filled up. Phaniang and Shen River plain which is upstream from the phetchabun mountains. Shen River and rivers flowing west from carpet convergence Before the positive flow North to join the river filled up as well as Phong River, flowing through a channel to the East of Phu Phan mountain range called "the flesh to squeeze" Ubolratana dam area. Phong River flows to the East until passing through Highway No. 2 (mittraphap road), then turn to the South flows down the river Chi to the southeast of the province of Khon Kaen. Ubolratana dam San supplements The flood occurred and 2521 (1978) large 2523 (1980) throughout the Northeast. So the water flows into the reservoir of the dam as water quantity is greater than 2 Ubolratana average inflow basin each year. Although the dam is releasing water through the overflow drain door in much quantity, it appears that in 2521 (1978) The water level in the tub is still too high level of clay core dam approximately 0.24 m and by this dam is a rock-filled dam clay. Some of the water to absorb the overflow skip the clay core dam at the end of the call, which may be harmful to the dam. Flooding in 2521 (1978). cause damage to plantations along above the dam and dam at the end of three hundred acres of land area as well as in the public domain and property of the people who live in these areas, the valuation of damage is approximately 620 baht best damage from flooding in 2523 (1980) think is worth approximately 266 million damage. These issues therefore EGAT to consider Ubolratana dam improvement project and approved by the Cabinet in December 6, 1983 the end of construction completed in 2527 (1984) 2530 (1987) Use the total investment to 435.4 million. An investment of baht The number of foreign 244.90 million and another 190.50 million. From the credit institution's loans for renovation of Federal Republic of Germany (K.F.W) How to improve San dam. 1. increase the height of the dam to the original level of 3.10 meters from another 185 m (great..) as at 188.10 meters (great..) the width of the base and the perpendicular dam dam San section extends from the original meaning. Width 120 m is 125 meters. 2. improve drainage and soil reinforced walls, tomo runs off down the overflow drain door sill 5 meters from the original 176 meters (great..) as well as changing drainage and 4 series, is lower than the water level and adjust spout water water bottom pick (Stilling Basin) to reduce the impact from the water that drains out to the end of the water. 3. other supplementary operational khandin walls, building power plants, rising 1.50 meters, again improving the entrance room, winch, etc, etc. Benefit from improved San dam. 1. prevent water overflow dam dam San, which may cause crash. 2. do not reduce the level of catchment dam, so the electricity still has the original. If not, adjust it to reduce the level of entrapped.
การแปล กรุณารอสักครู่..
