The 4. Duties and responsibilities of the employer.The buyer has the right to amend the 4.1 or reduce. From the original form and construction items or material change of various devices, everything within set together. Without stop the contract, adding or reducing the job will be charged time, the employer payment and must be agreed contractors well written. The amendment or reduce the work of style and construction items. Or the change of various materials. If the action into the cause of the structural strength lower than standard. The contractor has the right to refuse to change them.
การแปล กรุณารอสักครู่..
