3. KPI rise since July - August (1:48 to 1:55), the expected result from the use of more water vapor per Product. And the loss of steam left in the system, Process Solutions team will conduct a study on the Star Kier to continue to reduce the steam valve open.
การแปล กรุณารอสักครู่..
