Discuss and understand both TPCC staff and contractor QC, including the QC team at the work shop, on important points that need to be checked: 1) the position of the valve and actuator rod 2) the control of the fabric. Daily inspection 3) about gasket, especially metal jacke
การแปล กรุณารอสักครู่..