The development plan of the country's electricity generation capacity, Thailand (PDP2015) is 2558 (2015)-2579 resolution agreed upon August 15, 2014, by which time PDP2015 plan is consistent with national economic and social development plan of the Office of the national economic and development สังค 'll find at all, (sasot.) and make (1) อนุรักษ plan. Energy (Energy Efficiency Development Plan: EEDP) and (2). Renewable energy development plan and alternative energy (Alternative Energy Development Plan: AEDP) as part of the PDP 2015.Renewable energy development plan and alternative energy (AEDP). promotion of electricity from renewable energy to reduce the discount to import energy from fossil fuel by increasing the proportion of Yap has no electricity with renewable energy from the present 8 percent to 20 percent of the country's total electricity demand in recent years, the production capacity of electric 2579 from renewable energy total is equal to 19, (634.4 megawatts solar energy from last year: 1, 298.5 megawatts 2557 (2014) Add a 6 000.0 megawatts within a year, 2579) Moreover, during the year-2579 require 2558 (2015) purchase of electricity from the VSPP (AEDP plan) total electricity generation capacity of 9 megawatts, 735.6. As renewable energy group total capacity, megawatts of electric-9701. The production system of electrical and heat energy (Cogeneration) integrated electrical capacity 34.6 megawatts.
การแปล กรุณารอสักครู่..