Education go to the platform board in the centre of the working platform check the, voltage LED is on (POS. 2 Fig. 4.3.3).Education check that the outriggers LED is off: If this is not, the case it means that there is a malfunction in the stabilisers. End runs (POS. 4 Fig. 4.3.3).Stabilise the, machine correctly proceeding as follows:Education make the outriggers descend by alternately activating the levers (POS. 1-2-3-4 Fig. 4.3.4).Education moving the levers downwards extracts the stabilisers moving the, levers upwards retracts them.Education fully extract the stabilisers to lift the tracks.Education observe the spirit level (POS. 5 Fig. 4.3.4) situated at the side of the stabilisers controls and correctly level the. Platform by appropriately, activating the stabilisers levers: the machine is levelled correctly when the air bubble inside. The indicator is positioned, in the central section (0 °).Education check that the LED has switched on (POS. 4 Fig. 4.3.3) that indicate the consent for boom ascent.
การแปล กรุณารอสักครู่..
