The composition of the furnace is designed to have two combustion chambers. The first combustion chamber has a rectangular shape curved roof. Enter the front door for solid waste. Dump trucks, which can enter the combustion chamber. Within a grill for supporting solid waste. And the air supply to feed air to the combustion in the flame (Overfire air) and the flare (Underfire air) combustion process to control the flow of about 120-150 percent of the required air volume. According to the theory (Stoichiometric) waste is being set on fire and ignited manually or using oil to ignite. When Garbage can burn on its own. Burning is governed by the principle combustion excess air. Exhaust gas and drifted into the combustion chamber of the second. To burn again in the second part of the combustion chamber is a cylindrical chamber mounted above the first. Consists of burners and the air volume of about 140-200 percent of the air required theoretically. To burn completely. The time it takes to burn (residence time or retention time) of not less than 1 second pollution control systems using a cyclone for dust collection, large process work, incineration dry through the garbage. wet out Garbage can destroy 1,000 kg of dry waste by entering a single. The first combustion chamber designed to accommodate the 1,000 kilograms of dry solid waste combustion process in the combustion chamber, the one caused by burning themselves with excess air. Without using the combustion assistant. The combustion chamber works two excess air as well. But there LPG burner. Helping to maintain a minimum temperature of 1,000 degrees Celsius throughout the operation.
การแปล กรุณารอสักครู่..
