Apart from that Mine was Planing to the preliminary planning of the Pump installed and the length of the pipes to be used since the year 2015-2019, according to the attached file below.
In addition, the team Mine Planing the preliminary plan of installation Pump and the length of the tube to be used since the year 2015 - 2019. Per file attached below .