- The second pump and note the meter. And the gas tank 30. - Wiring ran in Terminal 2. - Installed halogen lighting and adjusts the sales department. - Off pump.
-Open air compressor 2 and note the meter and insert the gas cylinder tank 30. -wiring Ran building 2. -install halogen bulbs and lighting sales department. -close compressor.
- open air pump 2, and write down the odometer, and the gas tank 30. - wiring Ran at the building 2. - Install halogen lighting and adjust the sales department. - off air pump.