We have details of the draw that we use with our production in the past and now with both of these models, and we've ever had to produce them, and then with a purchase order.
We have detailed drawings that we use on our production now and in the past with both of these models, and we have never had to produce them and the orders of the past. So we are not sure which one is correct, as attached.