5.3.3 public health and community services, and environmental management
5.3.3.1. In the current environment.
Health conditions of the people in the project area, the tea rae from the survey showed that households are often chronic illnesses are respiratory/cold and there is no serious illness, sexually transmitted disease. 5.3.3.2. social impact assessment
1). Construction term
Construction activities, the project may cause adverse effects in terms of causing annoyance from noise. Vibration and dust, which may affect the respiratory system of the nearby construction areas. Construction operation may have different local labor join live in areas that have poor health or epidemic infection in an area may affect the community. The effect is temporary, which is the lowest level of impact (-1)
.
2). Activity on the part of the interval act with the conveyor into the water network. Water diversion are crossing the watershed that may have contaminated the germs. Carriers of the disease to the water/water, farmers in various areas. As a result, there is a risk of illness from agricultural chemical contamination in the body as well as result in aquaculture as a food that is popular with people in the area accumulated toxins in the food chain. And over time that there is water in the area, longer life cycle of parasitic infestation or disease that are associated with water, there is a continuous and long lasting. To control the spreading is difficult work (circuit breaker by nature, never happened.) Roundworm diseases such as leaf. Disease, dengue fever, malaria, leptospirosis can assess the impact on the lower level (-1), however, because the people in the area have an opportunity to make additional income. Better economic conditions. Make a general health of the people in the area. Have a positive impact on the smallest level (1)
?5.3.3.3 measures to prevent and resolve social effects of
1). Construction stage
(1) Implementing measures to prevent and reduce the environmental impact in the. Dust. Sound and vibration and occupational health of workers
(2) injection in construction area rug that has to be diffused distribution of dust. By piercing the carpet water at least 1-2 times per day, in case of dry weather conditions or have quantity of dust, spray the carpet for at least 3-4 times per day
. (3) vehicle transporting materials used in the operation. There must be a cover or a binding material. Every moving thing or device in order to prevent distribution to disseminate and fall of materials
.