1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 planers must have a card (Guard) cables and other equipment used to test condition. And other equipment intact. The sticker passed state from maintenance. And allow the use 3
.5 block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
3.6 equip PPE ที่มีมาตรฐาน prescribed (WI-SR-001)
3.7 install tray scrap parts from the planing and partition the office work
3.8 wind, planing layout electric line rails hang up or hang a hook. S made to order
3.9 shouldn't be the front leaf planing. Because there may be special workpiece splash into the eye and the body
3.10 time overhaul to catch planing machine. Don't carry the breeze or wires. It
3.11 when not working or not in the planing workpiece. To remove the plug planers immediately
3.12. When the machine planing damaged to quit. Return to the store and repair
3.13 provide scaffolding, ladders, or the seat proper planing workpiece on a higher 3
.14 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.