The value of the investment construction project consists of civil engineering and value system, MTR, silver, 426,898.56 million. By a range of construction as follows: • The range of Bangkok – Phitsanulok 212,893.31 million. • Chiang Mai, Phitsanulok, interval – 214,005.25 million.
การแปล กรุณารอสักครู่..