Both the ITEM and Material production in 2015 date 27/7/28 day delivery/7/7/29/2015-2015 Reject back on 2/8/2015 (for an indefinite period of time, so no animation to 6 months).
Material and production both on 27/07/2015 ITEM delivered on 28/7/2015 - 29/7/2015 Reject Return on 08.02.2015 (a period of inactivity so. Less than 6 months)
And the Material both ITEM produced in the 27 / 7 / 2015 delivery in the 28 / 7 / 2015 - 29 / 7 / 2015 Reject back on 2 / 8 / 2015. (period of time no movement is less than 6 months).