The building is falling down (with groundwater, building construction, building, due to a long period of time) The reasons which result in Hitachi's chi needs to make corrections in the new contract in a matter of an elevator carriage design. A stated that the size of the depth of the elevator carriage is 1.35 meters, but the cause of the falling down of the building. To cut out the number of elevator carriage size 10 cm is 1.25 meters remaining, but the speed and the elevator carriage remain unchanged, as originally defined.
การแปล กรุณารอสักครู่..
