Line the preliminary master plan motorway between city JICA study. The 2534 will have a beginning at separate levels. A.DOI saket, which is the end of the motorway between the city line, Lampang - Chiang แนวเส้นทาง is geared to the northeast. Parallel to the highway 118 by staying on the right hand side of the city.Through the mother's house the pagoda.Wiang PA Pao, MAE Suai district along the route are cut to a highway 118 at points north, MAE Suai District, at a distance of about 130 kilometers. A.DOI saket, then the going on the west side of highway project 1 end confluence with highway 1. Mueang Chiang Rai, a total distance of about 150 km.
การแปล กรุณารอสักครู่..