This project aims to study the conditions of the problem and improve the transport and storage of raw materials, with the scope of the study is to transfer raw materials, Bruce wanetto in front of the factory to its raw material storage area, floor area 1 based on the principle of improving our.Ngachak loss of 7 counts from information gathered and analysis found that a story should be updated wasteland caused by transportation of raw materials and the losses from the movement of an employee to fill the material into the tank before it is put to use by the best of our.Bangkok transport routes by placing a new raw material storage space make storage volumes increased by 44%, which is enough per consumption on 1 month, then you have come to the forklift was stationed at point of raw material storage area, floor area 1 instead of a regular space make it possible to store points.Reduce the distance to transport raw materials declined 90% in the reduction of losses from the movement of an employee after making adjustments by changing to new raw materials supply tanks with a capacity greater than ever to reduce the number of employees in the fill material into the bucket 3 times per week can be decreased 86%Therefore, this project can increase the storage of raw materials. Reduce the distance to transport raw materials and reducing the number of times an employee's raw materials.Keywords: revision/relocation/moving/storage tank/raw material supply raw material.
การแปล กรุณารอสักครู่..
