Since it is the holiday for several days. Employees of the brave engineering has been absent. Make the length of the delay, which is the problem of po brave engineering of brave engneering apologize at this.
Because this is a multiple-day consecutive holidays to employees of Brave Engineering has leave of absence, the duration of the exit delay PO, which is the problem of the Brave Brave Marine Engineering Engneering apologize at that.
as it is a holiday for many days, the staff of Brave Engineering. There is a period of absence, the PO slower than specified, the problem of the Brave Engineering Brave Engneering must be sorry for this at that.