1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 inspection of various tools before use to condition available
3.5 provided the look out fire with fire extinguisher operation
3.6. Wear PPE device with standard setting (WI-SR-001)
3.7 tools or equipment used in the maintenance, installation electrical control panel and electrical equipment various should be a kind of insulation on the handle
3.8 panel face book electrical and electrical different, such as cables, transformers, switch panel, etc. must adhere to the rules of interior of electrical safety. The 3
.9 cut power to the associated with the circuits with the installation, repair, or edit operations. Electrical control panel and the lock with the key. Equipped with warning signs that maintenance of machinery equipment and electrical control panel that
3.10 assembly, electrical control panels To install equipment cut off the electricity leakage ELCB (Earth Leakage Circuit Breaker) with a peripheral circuit socket with every time
3.11 electrical control panel and electrical equipment to be installed wire (Ground Rod) by the size of the ground must have size requirements as follows:
.- direct current. Size not smaller than the ground to late the largest circuit, or the size is not less than 8 ตารางมิลลิเมตร
.- alternating current, grounding must not smaller than 1 / 5 of tendon brings the biggest cycle, or the size is not less than 8 table
mm
-. Main soil (Ground Rod) to deep, no less than 1.2 meters and resistance measurement was no more than 10 ohm
3.12 equipment outlet and jacks, dashboard electrical must be a type that prevents water. (water Proof) polar soil (2P E)
3.13 when installing electrical control panel at the front, the key lock by the electrician who control the collect keys. Ready to write announced on electrical control panels The electrician responsible for the installation location and contact numberOr the maintenance department
.3.14 electrical control panel and electrical equipment that are installed to provide shelter the sun and rain to prevent short circuit
3.15 banned no responsible to improve, change or repair electrical control panel and electrical equipment. Strictly
3.16 checking electrical control panels And electrical equipment are in accordance with the time limit
3.17 provide scaffolding ladder or safe in repairs. Installation of electrical equipment on high
3.18 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.