Monthly report August utility Department, a big problem in this month's. 1. boilers 15 tons, twice causing the leak stops water pipe, but the pipe problem treats inside the boilers. The Edit link of the ring together, the increase in the monkhood to solve long-term problems Shut down yearly to make the outer pipe and change the air distribution inside the furnace head.2. Mixed Bed system # 1, 2 chutkrot valve leakage problems and spotted the unusual result in regen, regen more affect the quantity of chemicals used, and overall # 1 Mixed Bed resin, which after low-resistivity values up and regen resulted in water volume reduction DI system, to solve problems and make the valve set to restore the Mixed Bed system before storage in order to compare the performance again.3. a KPI values higher, since the month of July-August (1.48-1.55), causing the expected result from the manufacturing process that uses more water per volume are and lose steam left in the system, the team solution Process to do a study on how to reduce the Star Kier, turn the steam vent valves.
การแปล กรุณารอสักครู่..