Vascular system from the main building and B06 B07 must install the floor terrace 2 of buildings by the seller must do support structure vascular system. (the raw material type leaves and stem on the second floor of the building. 1 were to be transported by car, forklift1 up the lift of the building to put on a conveyor belt to enter the log material
.
the conveyor from the building B07 to the building B02 the tobacco factory prepared steel structure knitted to รองรับสาย pan for crossing the street. The seller must prepare the belt on the steel structure factory knitting tobacco prepared from the building B07 to B02
.All the vascular system must have a tunnel along the rainproof cover Can the maintenance conveniently.