3.3 inspection procedures3.3.1 preparation tools and accessories successfully3.3.2 cleaned workpiece from the tasks 1.1,3.3.3 generate magnetism with a Magnetic Yoke on the workpiece.3.3.4 will be saved sprinkled powder steel welding area as required.3.3.5 check for flaws and defects in the weld.3.3.6 recording inspection results3.3.7 cleaned workpiece.3.3.8 wash, loosen the magnetism the workpiece.3.3.9 to put equipment and cleaning the operating area.3.3.10 the submission and inspection
การแปล กรุณารอสักครู่..
