Counsel further informed that the contract specified performance / operational status. In the box below Details referred to the two above it
is now the contractor has performed the completion of the Enclosure with advisor will be collected to prepare a report on warranty defects, 2nd and presented to the railway. Following
การแปล กรุณารอสักครู่..