Results from the study of economic and social conditions above can be seen that in the present area of study of the project. Study on the suitability of the construction railway square Chaiyaphum Loei Nong Bua lamphu – or – – Lam Narai – Loei – Nong Bua lamphu (province of Lop buri, Nakhon Ratchasima province, Nong Bua lamphu, Khon Kaen, Chaiyaphum, Udon Thani, Loei and phetchabun provinces.) There are social-economic growth rate soared, which arises from a tendency to natural changes within the area of education, and as a result of a planned development area of economic, social and environment policy development or infrastructure that encourages economic growth and social development.Add higher by extending the service area with the Rails to Loei and phetchabun, which is an important source of tourism and agriculture, and the path trains, transport services for passengers and goods, it will increase the ease of travel. Links to neighboring areas. Business, as well as various types of means of transport is the development of the highway network linking transportation routes to neighboring countries as well as North-South economic corridor – vertical (North-South Economic corridor: NSEC) in North Eastern tributaries (North-Easter.N Economic Corridor) from Bangkok-Loei – Luang Prabang and ends on the South China Sea, Viet Nam, as well as the country, Thanh Hoa city result plus further expansion of economic and social development both in the local level. The region and the country pose a consistent and support the plan. Economic and social development policies of the Government to achieve the goals set by the.
การแปล กรุณารอสักครู่..
