This contract made between SPRING AIRLINES CO., LTD co., Ltd. offices located at 4F Building No.3, Homeyo Road, Konggang Hotel No.528, Hongqiao International Airport, the First Shanghai, China, where in this agreement referred to as the "employer" with one EVENT ORGANIZER MUNZ CO., LTD Office is located at 121 SOI ladprao 64 separate 6 ladprao road, wangthonglang, Bangkok, in which this contract is called the "contractor". Both parties agree. These are the following messages. Verse 1) "employer" OK "and" OK get the contractors hired to work designing the structure and decoration of booth, with SPRING AIRLINES CO., LTD in Thailand to "travel around the world," the times ... the 18 THAI TRAVEL FAIR INTERNATION 2016 17-2559 between February 21 at the Queen Sirikit National Convention Centre with details based on a quote number QT001/59/1400 down February 1, all paid value 200,000.0 2559.-(two hundred thousand) 2.) "employer" OK, pay for the work, as detailed in section 1) as follows: 2.1. "employer" pay installment agreement, provide to the contractor "1" is the number of advance deposit of 50% of the total amount of wages total 100,000.0.-(one hundred thousand) is paid by "contractor" for this contract and, as part of pay with a. 2.2. "employer" pay period 2 agreement provided to the contractor, "" 50% of the entire amount as wages 100,000.0-(one hundred thousand) to be paid) by the contractor, "operation finished." 3.) warranty damage from construction contractors "consent" warranty, damage from finishing construction, as detailed in this contract work by the corruption that occurs, they must be caused by the construction of the "contractor" only proves that caused khangam or defective construction, decoration of the "contractor," which are not from the wrong way. An accident or caused by negligence in the use. An 4.0) to change, modify, or any material that is used in addition to the stipulated in the contract by the contractor, "" this is allowed when a letter from "before" employers only. However, the "employer" be able to change or edit the material or. And not to increase wages. If a change does not lead to an increase and change the device that have the same price with the original device. 5.0 message) if there is a change or correction, or a contract, the parties sign in section edit and edit that section, that is binding both parties. An "employer" 6.0) or an agent of the "employer" can work in a "contractor" by the need to facilitate, including security. 7.0) in an operation "contractors" are required to abide by all rules and regulations in place, including laws related to work and take care of the work, subject to all such action as well, including must not do anything that is illegal, and must take care of and be responsible for the safety of those working or other persons into place with. 8.0 messages of breach). 8.1) breach by the contractor, "case", "contractor". Compliance breach any of this agreement "allowing" contractors "employer" payroll deductions as a "contractor" will receive a contract in article 2), and claims no later than by the actual obligations, responsibilities and scope according to the attached quotation. 8.2) breach by the employer "case", "employer" in default of payment, according to the terms of the "employer's" consent "contractors" in the rate of interest of 20% (twenty). Per year by the number of pay periods at all by the count starts from the date the "contractor" will have to be paid by contract terms until this all gets real "contractors" can also be considered with the contract. This notice of termination of the contract, 7 days in advance by written contract place. Per the parties unless a serious fault, e.g. to intentionally cause "employer" is damaged, which is not required to provide advance notice and termination of the contract, to take effect immediately. 9.0 message) if there is a force majeure occurs with either party. Preventing the next operating contract, such as a natural disaster or war, dropped a thousand contractors from liability under this contract. This is only in the section that has not yet adhered to the contract. This contract is made in two. The correct text is an exact match. Neither party has read and understood the text in this agreement by and. See that was their intent, therefore, must be met, and the seal is important (if any) as important witnesses, and each faction retained.
การแปล กรุณารอสักครู่..