Program performance Progress Report No. 3
Progress Report No. 3, comprising the steps to perform step 5, the result of design. And the possibility of using technology to conserve energy. And the gathering is to renovate the building with the use of net-zero energy. And Step 6 Update buildings were selected for use in this study developed based on the original design. Details of the operation is as follows.
การแปล กรุณารอสักครู่..