It was found that the high SD may be because they do not know the exact maximum load , thereby increasing the maximum load by the maximum load is 20% of the height of the bridge.
The results showed that the high SD may because of unknown maximum load certainly thereby increasing the maximum load by maximum load is 20% ของความสูง. Of the bridge.