At present, the company experiencing a plant maintenance plans that lack appropriate due to the expansion and additional departments are at a later time by a lack of scheduling system, which found that the problem is that there are more than necessary work stations such as materials and equipment of the same type, the archives are a repository of many points because there is a separate sub according to each Department, it's difficult to control and monitor. To lead in the process of moving materials and equipment because of a lack of sufficient space allocated to storing supplies and lack of management system of material handling and material flow with a winding motion or reverse flow in order to reduce the distance. How long it will take to move materials and equipment and reduce other wasteland that occurs should control systems design and update the chart of the area.
การแปล กรุณารอสักครู่..