On one side of the cable is fitted with a PIN. Side tie the roll with the master pin and cover with copper pin lanyard over. Swivel pin 3 to pin cable and thousands of embedded into the pin-block. Do this one Part of the action as being installed, along with hammerhead and wedge. Make a check and Julian, the various components of the action.
การแปล กรุณารอสักครู่..
