After the construction of the structure near the roof started to prepare to take action outside the Base, Site Drainage, including the Sub Sub Grade Road, Footpath & RC.
After completion of construction of structures close to the roof and began preparations are done outside of Site Drainage, Sub Base, Sub Grade, RC. Road & Footpath.