This project was established to solve the time aluminum plate is lacking. The past in the case shee lack will take a long time for 3-4 hours. In order to reduce the time in per sheet down the เอฃ้ unchi, in part Production and Maintenance discussing and thinking to do the project stopped before. ACC.
การแปล กรุณารอสักครู่..
