This bridge was inaugurated on 4 April 1994 by His Majesty King Bhumibol Adulyadej's global Cummins Navy. King of Thailand, and Mr. Pu Savan, president of Laos. The bridge has a length of 1170 meters, the car has two traffic lanes and a rail track two lanes wide and 1.000 meters, the first rail construction budget of US $ 30 million. With assistance from the Australian Government Construction period between October last year. 1991 to April 1994
การแปล กรุณารอสักครู่..
