Before making the rock spread grout firmly compacted soil must be made to make the rocks area spread grout firmly to ensure that it is not less than as prescribed in the stone tiling grout material must be on the first floor there is a foundation stone in thickness as required spread grout must be placed in such a way to give the cubes small cubes c big.To make each stone flush. The lay must start from the bottom up to the top floor, the shifting Foundation. Big rock samples must be distributed. Please do not lump together, along with a stray small dress the surface of each stone as stone. plane with side ties throughout the thickness of the layer of stone lined pills. The trend must not be less than. The excess, embedded in the floor sink with primer, Grout according to the space between the large rocks with sand cement (Mortar), an aspect ratio of 1:3 knock firmly and smooth Interior.