Comparing the results of economic analysis project
project. Study results. The original study of
C B NPV/NPV EIRR EIRR B/C
% (million) (million)
Eastern outer ring road (9) 1079 21.6 12.8 1.13 3005-
.Bangkok-chon buri motorway (7) 12.4 7.20 22393 39.6 1.10 901
:
consultants. The project analyses results showed that project implementation is appropriate because economic indicator is higher than the criteria in all aspects of both projects. (Line 9) and the Bangkok-chon buri motorway project (line 7) is a scorecard, lower than the original study, because when the actual project implementation cost value and benefits of a project versus a study project, there is a difference. Value of construction projects that have been estimated in the study period, lower than the actual construction, because the study was designed as a highway, while the actual construction project when operating as a special Highway between the city and the store.Entrance to higher project costs. At the same time, during the time of the study project. There are traffic volume forecast model of road network that is different from the current condition. Major road projects have not taken included in the original studies include a project to enhance the livelihoods of the Orient. 10 channels of traffic, both of which provide services on the same routes and motorway projects in the appeal on a motorway. At the same time, the fundamental economic variables, which are used to analyze economic crisis occurred before project is forecasted at higher than reality. Economic assessment shows that the project execution in the past period is appropriate and the project has helped to conserve the resources of the country as the current value of several billion baht. In response, the purpose of investment, construction of the infrastructure of the public sector to developing countries and promote better public benefit. Why, because of factors related to the project, both direct and indirect. Important factors include the price of the construction projects that are much higher than estimated. As well as the variation of the economies of countries. These factors, it should be presented as a caution to study other projects to bring into action:
.
การแปล กรุณารอสักครู่..