This project aims to improve the capacity of forming of automotive parts by balancing the capacity for Small Press to increase productivity and reduce employee overtime (O.T) data from the study, it was found that the capacity in the production line (MANUAL) J capacity exceeds the capacity to.Be open to working overtime (O.T) while the production line there are H (ROBOT AUTOMATION) remaining capacity to work shift 2 is therefore analyzed to find the cause of the problem by using Why-Why Analysis tools and techniques, questions 1H with 5W continue improvement by moving work pieces, REI.NF; R/RH/LH SEAT BK BODY PNL on line H (ROBOT AUTOMATION) with an action step is the actual increase experiment (Try Out) prepared the materials and equipment used in the update. The measurement and evaluation. Results of the update operation, it was found that the capacity of the production line J (Manual) decreased from no more than two work shifts do not need to open the overtime (O.T) output increased from 129 pieces per hour, or 55.8% reduction in costs per month or Stoke have 42520 baht 25% and can reduce labor costs for overtime (O.T) in September and October. 16434.08 THB.
การแปล กรุณารอสักครู่..