A study on the cost of lime production outside the season. It is found that the total cost is 1 Park from lime production outside the season, 119, 310. The Park has 2 baht total costs from the production of lime, outside the season, 55, 150. The Park has cost 3 baht total lime production outside of the season, 59, 750. THB
การแปล กรุณารอสักครู่..