In the case that have been notified as a worker in a machine-like, touch the same was absorbed light. In the maintenance section, it invited incoming electrical engineer check using leak Tester equipment of the electrical system, while checking the machine with power as normal. The preliminary investigation found no leakage of the electrical system. After this, they keep track of check periodically by skilled electrical event.
การแปล กรุณารอสักครู่..
