Will be fitted with a device to prevent hot water installed inside the hole, which is the mechanism used to secure control of the wells drilled in the early stages. The area has become a place where the risk of contamination from the project. By the well's mouth hole is built cars concrete barrier to prevent water runoff from concrete to flow into the well hole, the runoff area pond wellhead may be contaminated with oil, so the project will pump water runoff aforementioned. to a separate status to separate oil from water. The water will be stored separately in a tank of water from the production process. Injecting compressed to return back to the water in the implementation of the project. Will provide a staff performed regularly to monitor the level of water in the pond. Where the volume of water in the pond to 70 percent, it will continue to pump water runoff to enter into a separate status. Runoff pond surface area of the hole was 3.28 cubic meters per day.
การแปล กรุณารอสักครู่..