Tomorrow (bowels Jan 15, 2016), we made out of leaves. Then we will be able to Level transmitter out the next day (Jan 16, 2,016) Material Exit Gate Pass.
Tomorrow (Wu Jan 15 2016), we do the leaves of out, then we will be able to bring Level transmitter out on the next day (Jan, 16 2016) material. Exit gate pass.