Results of project implementation progress report vol. 3The progress report includes 3 action steps Step 5 summarizes the results of the design and the possibility to apply energy conservation technologies and bring the building gathering to make a building with zero net energy consumption and step 6 adjust the building selected for use in the battle of sotphatna, according to my design. The details of the operation are as follows:
การแปล กรุณารอสักครู่..
