Metaru Department. Machinery production increase over the target name BB04 The machine name of the target is 375 pieces/BB06. but it has 345 pieces/hour.That is lower than the target.
Metaru division title BB04 machinery production increased over the goal. Construction of BB06 goal is 375 pieces / hour but produced 345 pieces / hour , which is below the target.
The Department Metaru machine name BB04 production increased over the target. The machine name BB06 goal is 375 pieces /ชม. but produced 345 pieces / hour, which was less than the target