Study forecasting technology They selected the Nostradamus program to use and then provided weather information. To pilot forecasting the electricity production capacity of 8 SPP power plants.
The forecasting technology is studied, Nostradamus application program is selected to run, and then meteorological data is provided to test and predict the power load of eight SPP power plants.