Solutions and relief to the flood canal basin Utapao
flood occurred, leading to the targeting of the solutions to alleviate flooding for canal basin Utapao to have the ability to prevent flooding occurred. A level of protection at high flood prevention currently available is a drainage ditch drive. 1, ST. 3, ST. 4, ST. 5 and drive. 6 provides the ability is not enough to prevent flooding levels. Defined The flood mitigation project, which is a measure of the building and not the building. Including improvements and dredging canals. Dredging canals to create an enclosed space, the construction of reservoirs upstream communities and cheeks to reduce and slow down the water flow forecasting system / alarm control plan. Land use and therefore consider ways to improve primary. The period Short, medium and long-term plans are summarized below.
การแปล กรุณารอสักครู่..