5.3.4 Within eight months, the consultant will be required to submit the Draft Final Report (Draft Final Report), which requires the draft report of the study and analysis of silt in the channel navigable port of Songkhla, which covers the entire educational process. And a suggestion form cutting, dredging appropriate. The report presents a set of 10 discs with CD-ROM 2 series.